VANDIVERROGERS.COM 2×1 COMBINED CYCLE UNIT SIMULATOR · INTERACTIVE
UNIT OFFLINE — SELECT A START MODE
0 MW
TOTAL NET OUTPUT
FREQUENCY (Hz)
0 psig
HP STEAM PRESSURE
80 °F
GT EXHAUST TEMP
LOAD MODE

Machine Status

GT 1SHUTDOWN
SPEED0 RPM
LOAD0.0 MW
FLAME
BREAKER
GT 2SHUTDOWN
SPEED0 RPM
LOAD0.0 MW
FLAME
BREAKER
STEAM TURBINESHUTDOWN
SPEED0 RPM
LOAD0.0 MW
BREAKER
STEAM AVAIL
DUCT BURNERS

Master Control

UNIT SEQUENCE
SYNCHROSCOPE
LOAD CONTROL
AUXILIARY
EMERGENCY
Simplified 2×1 combined cycle sequence — timings accelerated. Start a unit, wait for FSNL, sync each generator to the grid, then pick a load mode. Steam pressure builds off GT exhaust and rolls the steam turbine automatically.

Unit Trend

TOTAL MW (0–520) HP STEAM psig (0–1000) GT1 SPEED RPM (0–3600)

Sequence of Events